- Limit switch for all 6 directions-fwd, aft, port, starboard, lowering and hoisting.
- Mechanical stoppers in case limit switch fails.
- Overload trip.
- Electromagnetic brake. Release by availability of electric power.- Fail safe arrangement
- Rail guard over the pulley
- Mechanical locking arrangement for rough weather
- Locking arrangement and hook for safe carriage of load.
- Clear marking of Safe working load on crane.
- Breakers at various places. One in engine room and another in ECR.
- It shall be operate in 50 list and 20 trim.
Marine Engineering exam notes for Seafarers
Such beautifully written. And the information provided is very useful. Thanks for sharing such informative and interesting article. Check this out too overhead crane manufacturers.Thanks!
ReplyDeleteI appreciate you providing this information to us. Give in this manner as you go on. If you are looking for overhead crane training kindly click the link. Thanks a lot.
ReplyDeleteThis post highlights how essential reliable crane services are for construction efficiency. Safety, precision, and expertise make all the difference in lifting and heavy-duty operations. Great insights!Read more info about cranes in chennai
ReplyDeleteThe precision and focus of a crane operator are unmatched. Their ability to manage heavy loads and complex machinery significantly boosts efficiency on construction sites. Very impressive and highly valuable.Read more info about Forklift Training in California
ReplyDeleteGood day sir, would you be able to explain the last point please? Does it mean that it should be working at 50 degree of list? Isn't it too much list for ships?
ReplyDelete