- Temperature and alarm sensor for pumps
- Monitoring system for hydrocarbon gas
- Bilge level monitoring devices
- Interlock for lighting and ventilation.
- Cargo pump room should be mechanically ventilated and the capacity should be 20 air changes per hr of the volume of the pump room.
- Pump room bulkhead with ER should be class A-0.
- Spray shield around pump seals
- In order to avoid static electricity cargo is loaded directly into tanks ,the loading pipes as far as practicable should be led to the lowest area.
- Exd – light covers
- Height of double bottom in PR - B/15 or 2 meter whichever is less but not less than 1 mtr.
- An emergency intake located above 2m , the PR lower grating. The emergency intake should have damper fitted which is capable of being opened and closed from exposed main deck and grating level. – 15 air changes per hour.
- Fixed sampling line to attach portable gas meter
Marine Engineering exam notes for Seafarers
Comments
Post a Comment
If you have any doubts.Please let me know