- Take all safety precautions, immobilzation etc. ..
Procedure:
- Inform company and take permission.
- Read and understand manuals and note down all clearance.
- Carry out risk assessment
- Check for special tools and spares.
- Check last report and shop trial report.
- Obtain immobilization certificate from port authority.
- Debrief to all crew members (tool box meeting) n ensure every person involved on job are well aware about his duty.
- After F.W.E. ensure telegraph on stop and fuel lever 0. Then take control to ECR.
- Let the l.o. p/p run for approx. 30 min 4 cooling down of engine.
- Lock the t/c rotor.
- Shut off starting air supply at starting air receiver.
- Open indicator cock.
- Stop l.o. p/p after half an hour.
- Take propeller clearance.
- Engange turning gear.
- Losen pinching screw of tie rod.
- Remove protective caps.
- Clean contact faces and mount hydraulic tool on a pair of stay bolt positioned opposite to each other on middle of engine.
- Start retightening stay bolt and proceed working from middle towards one end of engine and then from middle again towards the other end.
- Maintain tightening press according to manual (900 bar) n retighten the bolt with tommy bar. Before relieving system press check with feeler gauge that nuts bears against contact face.
- Reconnect hyd. Tool to pair of stay bolt first tightened. Raise press 10% less than given in manual (900 bar) and check if nut is loose.
- If nut is not loose, tighten the stay bolt to 900 bar. If nut is loose, tighten all stay bolts once again to 900 bar.
- After completion retighten the protective cover.